I had to compromise with my wife to get the workshop built. The
bargaining included replacing the second floor of the shop with a master
bedroom suite
|
|
|
|
|
|
|
|
|
This photo is of the front of the house before the trees were taken down for the addition. |
|
|
|
|
|
|
|
|
|
|
|
|
This is a photo of the front of the house after the siding is hung. |
|
|
|
|
|
|
|
|
|
|
|
|
This photo is of the master bed room after the floor is installed and the furniture is delivered. |
|
|
|
|
|
|
|
|
|
|
|
|
This is another photo of the master bedroom after the floor is installed and the furniture is delivered. |
|
|
|
|
|
|
|
|
|
|
|
|
This is another photo of the master bath with paint. |
|
|
|
|
|
|
|
|
|
|
|
|
Part of the master bedroom suite includes a whirlpool tub. |
|
|
|
|
|
|
|
|
|
|
|
|
In the bath we also added a double shower. |
|
|
|
|
|
|
|
|
|
|
|
|
In the existing bathroom we removed the tub to make way for a door leading to the shower, whirlpool tub and bedroom. |
|
|
|
|
|
|
|
|
|
|
|
|
This is another view of the whirlpool tub, showing the ceramic tile and paneling. |
|
|
|
|
|
|
|
|
|
|
|
|
In the master bedroom suite we added a laundry room as this is where most of the laundry is generated. |
|
|
|
|
|
|
|
|
|
|
|
|
The master bedroom includes his and hers closets. This is Ted's closet. |
|
|
|
|
|
|
|
|
|
|
|
|
The master bedroom includes his and hers closets. This is Linda's closet. |
|
|
|
|
|
|
|
|
|
|
|
|
After we got the bedroom furniture Linda had to do some rearranging |
|
|
|
|
|
|
|
|
|
|
|
|
This is a second view of the master bedroom after the rearranging. |
|
|
|
|
|
|
|
|
|
|
|
|
This is a third view of the Master bedroom. |
|
|
|
|
|
|
|
|
|
|
|
|
Besides taking down trees that were way too close to the house and adding siding the only change that was made to the front of the house was adding a portico. |
|
|
|
|
|
|
|
|
|
|
|
|
The rear of the house now includes a double wide driveway behind the addition. |
|
|
|
|
|
|
|